How to get an IMMEX program
Who can hold a program, the export commitment, what goes in the file and the fifteen-business-day rule — with the article numbers.
Independent editorial resource
An independent resource for US procurement sourcing in Mexico: how IMMEX affects you, how to qualify a supplier, RFQs, and USMCA origin.
Sourcing from Mexico can lower cost and shorten supply chains — but the savings are real only if you qualify suppliers properly, run RFQs that price in the cross-border reality, and understand how IMMEX and USMCA actually work. This section is built for the buyer's decisions, not as a directory.
If your company will operate production in Mexico, start with IMMEX project requirements and the shelter versus standalone responsibility comparison. For goods storage and movement planning, prepare a warehouse requirements brief.
No supplier has been qualified by AMMEX through this pathway. Your procurement, quality and trade teams remain responsible for evaluating the evidence.
Editorial note: ammex.org.mx is an independent resource operated by Heberey LLC. It does not represent or affiliate with AMMEX, Index Metropolitana, INDEX Nacional, any authority, or prior operators of the domain.
Who can hold a program, the export commitment, what goes in the file and the fifteen-business-day rule — with the article numbers.
What IMMEX is, why it affects your cost and risk, and what "we have IMMEX" does and does not guarantee.
A structured checklist to tell a supplier that can actually take a US order from one that cannot — before you commit.
What to put in an RFQ to a Mexican manufacturer so quotes are comparable and the cross-border reality is priced in.
How a product qualifies for preferential treatment under USMCA, and why IMMEX efficiency does not guarantee origin.
The nine minimum data elements a certification must carry, who can sign it, and why there is no official form.
What a Mexican supplier's OEA certification signals, and how mutual recognition with C-TPAT works.
How Article 3 of the IMMEX Decree structures the five modalities, including Annex 3.2.2 Services (3PL, kitting, repair) and Shelter operations.
How Sectoral Promotion Programs and Rule 8 prior permits reduce Mexican MFN import tariffs to 0%–5% on non-USMCA raw materials and machinery.
Why IMMEX does not waive Mexican duties on Chinese/Asian components exported to the US or Canada, how the "lesser of" formula works, and Section 301 vs USMCA origin.
Line-by-line anatomy of Mexico's official customs declaration, valuation fields, DODA/PITA crossing QR codes, and statutory audit liabilities.
Complete reference to Anexo 22 Apéndice 2 regime codes, permanence deadlines (18 months vs 6 months), and F4/F5 regime changes.
How Mexican factories transfer goods domestically without crossing the border or charging 16% VAT, and how to survive SAT materiality audits.
How US companies place customer-owned molds and equipment in Mexican plants without losing legal title or triggering customs seizure.
How electronic value proofs work and what two-letter identifiers (CI, IM, TL, PS, C1, EN, V1) mean on a Mexican pedimento.
How automated inventory control (Anexo 24) and the VAT/IEPS tax credit ledger (Anexo 31 / SCCCyG) govern every temporary import.
Compare standalone IMMEX vs Shelter manufacturing, understand Mexican Importer of Record (IOR) rules, and avoid pre-shipment holds.
How certified IMMEX plants obtain the 100% VAT/IEPS tax credit at import, Rule 7.1.2 criteria, the $50M/$100M MXN fixed asset thresholds for AA/AAA (Rule 7.1.3), and AGACE suspension defense.
How US parent companies protect against Mexican Permanent Establishment (Art. 181–183 LISR) and calculate the higher of 6.9% on assets vs. 6.5% on operating costs.
Technical and legal guide for IT, ERP, and compliance teams implementing mandatory electronic SAT access to Anexo 24 inventory ledgers.
How to parse the monthly SAT Data Stage raw ASCII tables (501, 551, 554, 701) and reconcile them against ERP receipts and Anexo 24.
The 7 statutory triggers for precautionary seizure of equipment and raw materials, the 10-day legal defense clock (Art. 153), and bailout strategies.
How to value consigned raw materials, intercompany transfers, and tooling assists (Art. 65 Incrementables) without triggering Art. 200 valuation fines.
Statutory stay windows under Art. 108 of the Customs Law, the 6-month virtual import trap (RGCE 4.3.21), and comparing F4/F5 regime changes vs. A3 regularization.
How to diagnose negative Anexo 30 credit balances caused by UMC-to-UMT conversion errors and execute R1 pedimento rectifications safely.
Why US 10-digit HTSUS codes diverge after digit 6 in Mexico, how NICO statistical suffixes work, and preventing Appendix 9 RRNA border holds.
RFP scorecard for evaluating Mexican customs inventory software: automated VUCEM/Data Stage ingestion, FIFO lot engine, BOM versioning, and Apartado C readiness.
Compare turnkey contract manufacturing, IMMEX Submaquila notices (RGCE 4.3.7), and Virtual Pedimentos (V1) for domestic processing.
Navigating the 4 USMCA automotive origin pillars, PROSEC Sector XIX, and virtual deliveries to terminal OEMs in Depósito Fiscal Automotriz.
Managing COFEPRIS Appendix 9 import permits, off-site ETO/Gamma sterilization submaquila, and mandatory Art. 109 destruction of rejected medical devices.
How to eliminate 25%–50% Mexican steel and aluminum tariffs under USMCA Art. 2.5 using PROSEC and Regla Octava (98.02), and pass C6 Mill Test Certificate audits.
When the supplier and part are defined, use U.S. Import Compliance to organize the US entry responsibilities and evidence.